Installation Step 1


The bottom frame is connected with screws to the bottom cross beam and the bottom side cross beam, purlin 8*4 square pipes x9 are connected with screws

Installation Step 2


Each column is fixed with six sets of hexagon socket bolts, and the column screws do not need to be tightened

Installation Step 3


Measuring verticality of column with line drop and level

Installation Step 4


The top frame is connected to the top beam and the top side beam with screws, and the drain hole faces outward.

Installation Step 5


Install five top purlins

Installation Step 6


Install three horizontal square pipes and fix them at the welding angle of the top short beam.

Installation Step 7


Installation of four columns downspouts

Installation Step 8


Installation of 8 831 ceiling tiles

Installation Step 9


Top Spread Rock Wool Roll

Installation Step 10


Installation of single roof tile