Correo electrónico:
-
Language
Measuring verticality of column with line drop and level
The top frame is connected to the top beam and the top side beam with screws, and the drain hole faces outward.
Install five top purlins
Install three horizontal square pipes and fix them at the welding angle of the top short beam.
Productos principales
Contacte con nosotros
WhatsApp:
No. 58, Jiaoxiang Road, Jiaozhou City, Qingdao City, Shandong Province,China
Sitio móvil
Copyright©2023 Shandong Liansheng Intelligent Manufacturing co., Ltd. Todos los derechos reservados. Potentado por:300.cn Weifang|SEO|Subestación urbana